24/08/2012 Cohuna (Gunbower Creek)
Widespread public complaint
BGA bloom on Gunbower Creek
PAC dosing system was operating at maximum output, in optimisation with pH and coagulation. Proactive flushing was performed at worst affected area.
24/08/2012 Cohuna (Gunbower Creek)
Widespread public complaint
BGA bloom on Gunbower Creek
PAC dosing system was operating at maximum output, in optimisation with pH and coagulation. Proactive flushing was performed at worst affected area.
24/08/2012 Cohuna (Gunbower Creek)
Widespread public complaint
BGA bloom on Gunbower Creek
PAC dosing system was operating at maximum output, in optimisation with pH and coagulation. Proactive flushing was performed at worst affected area.